• 万象城AWC

    PRODUCTS AND SERVICES

    Ziyang Maintenance Service Station

    The station was completed and put into operation in September 2020. It has the ability to repair the C6 power cabinet of the HXD electric locomotive control power cabinet. The business covers all locomotive depots of the Chengdu Bureau. A total of 15 TGY0